MIDDLE PAUNG LAUNG HYDROPOWER PROJECT

Salient Features of  Middle Paung Laung Hydropower Project

1.

Location

-

about 32 km north-east of Pyinmana Township,  Nay Pyi Taw Union Territory

2.

Type of Development

-

Dam Type Hydropower Development

3.

Catchment Area

-

2792 sq.km

4.

Average Annual Rainfall

-

1778 mm

5.

Average Annual Inflow

-

2870 Mm3

6.

Dam Type & Size

-

Roller Compacted Concrete Dam

Length- 605 m, Height- 106 m

7.

Full Storage Capacity

-

167 Mm3

8.

Dead Storage Capacity

 

91 Mm3

9.

Design Head

-

66 m

10.

Turbine Type

-

Francis Type, Vertical Shaft

11.

Turbine Design Discharge

-

200 m3 / sec

12.

Installed Capacity

-

152 MW (2 x 76 MW)

13.

Average Annual Generation

-

530.4 Gwh

14.

Project Period

-

(2014-2015) to (2026-2027)

15

Project Completion up to

(30-6-2022)

-

7.41%