The Republic of the union of myanmar

Ministry Of Electricity And Energy

Breaking News :

Mandalay Division


DEEDOKE HYDROPOWER PROJECT

Salient Features of Deedoke Hydropower Project

1.

Location

-

about 19 km Downstream of Existing Yeywa Dam, Mandalay Region

2.

Type of Development

-

Low Head Hydropower Development

3.

Catchment Area

-

29055 sq.km

4.

Average Annual Rainfall

-

1270 mm

5.

Dam Type & Size

-

Low Head Concrete Dam

(Length- 253m, Height- 25m)

6.

Design Head

-

10 m

7.

Spillway

-

Broad Crested Weir (Gated)

8.

Turbine Type

-

Bulb Turbine

9.

Turbine Design Discharge

-

700 m3 / sec

10.

Installed Capacity

-

60 MW

11.

Average Annual Generation

-

298 Gwh

12.

Project Period

-

(2015-2016) to (2025-2026)

13.

Project Completion up to

(30-4-2022)

-

1.727 %